Interior Department Approves The Record Of Decision For The TransWest Express Transmission Project


CSA Z462 Arc Flash Training – Electrical Safety Compliance Course

Our customized live online or in‑person group training can be delivered to your staff at your location.

  • Live Online
  • 6 hours Instructor-led
  • Group Training Available
Regular Price:
$249
Coupon Price:
$199
Reserve Your Seat Today
DENVER

TransWest Express Transmission Project connects Wyoming wind to the Desert Southwest via HVDC, adding 3,000 MW backbone capacity, boosting grid reliability, reducing greenhouse-gas emissions, and following a BLM Record of Decision after an EIS.

 

The Latest Developments

An approved 730-mile HVDC line moving 3,000 MW of Wyoming wind to the Desert Southwest, improving grid reliability.

  • BLM ROD approves right-of-way; 60% of 730-mile route on BLM lands.

  • 3,000 MW HVDC adds backbone capacity from WY to NV via UT to Marketplace Hub.

  • Enables Desert Southwest to access high-capacity Wyoming wind resources.

  • Creates up to 1,500 direct jobs/yr for 3 years; tribal and union partners.

 

Following eight years of comprehensive federal environmental review, the Bureau of Land Management, U.S. Department of the Interior has signed its Record of Decision approving the TransWest Express Transmission Project.

The TWE Project is a high-voltage, direct current (HVDC) electric transmission system being developed by TransWest Express LLC to directly and efficiently access diverse renewable energy supplies while reducing greenhouse-gas emissions. In a sector where some lines face delays such as the Manitoba Hydro line to Minnesota facing regulatory review, this significant energy infrastructure will strengthen the resiliency and reliability of the western U.S. electric grid by adding 3,000 megawatts of “backbone” transmission capacity between the Desert Southwest and Rocky Mountain regions.

A Record of Decision is the final step for agencies in the Environmental Impact Statement process for domestic lines, while cross-border projects also require a presidential permit in cases like the New England Clean Power Link before proceeding. The ROD was signed today in San Diego by Janice M. Schneider, Assistant Secretary, Land and Minerals Management, U.S. Department of the Interior. A Notice of Availability of the ROD for the TWE Project will be published in the Federal Register.

BLM’s ROD follows the May 1, 2015, publication of the TWE Project Final EIS, which BLM and Western Area Power Administration prepared as joint lead federal agencies. The Final EIS reflected years of detail-driven environmental analysis, public input, including oral traditional evidence processes in comparable reviews, and collaboration among 50 federal, state and local cooperating agencies. BLM and WAPA each issue a separate ROD to document the agency’s decision pursuant to its unique purpose and need, including any required conditions and stipulations.

The BLM ROD approves issuing a right-of-way grant for the TWE Project on BLM-managed land, which represents about 60 percent of the 730-mile route. TransWest has committed to hundreds of project-specific mitigation measures, best management practices informed by line-burying decisions on cost and safety considerations, and conservation actions designed to avoid, minimize and mitigate potential impacts of this infrastructure project to the environment.

“The Western U.S. needs new interregional transmission infrastructure like the TWE Project, which will allow California and other Desert Southwest utilities to directly access high-capacity Wyoming wind to balance and diversify their generation portfolios in a cost-effective manner,” said Bill Miller, president and CEO of TransWest, an independent transmission developer.

“Today’s important federal permitting milestone further advances the TWE Project’s progress and brings this critical infrastructure project one step closer to construction – creating employment opportunities across the West."

The project’s construction is estimated to create up to 1,500 direct construction jobs each year for an estimated three-year construction period. With a shared commitment to creating employment opportunities and strengthening the Western electric grid, the Ute Indian Tribe of the Uintah and Ouray Reservation, the International Brotherhood of Electrical Workers, and the International Union of Operating Engineers have signed partnering agreements with TransWest for construction of the TWE Project, reflecting the kind of Ontario First Nations projects engagement seen elsewhere in North America.

The TWE Project will extend from south-central Wyoming, to the site of a potential interconnection near Delta, Utah, and then to the Marketplace Hub near Hoover Dam in southern Nevada, which provides interconnections to the California, Nevada and Arizona grids.

 

Related News

Related News

Washington Australia announces $600 electricity bill bonus for every household

WA $600 Electricity Credit supports households with power bills as a budget stimulus, delivering an…
View more

Venezuela: Electricity Recovery Continues as US Withdraws Diplomatic Staff

Venezuela Power Outage cripples the national grid after a massive blackout; alleged cyber attacks at…
View more

New York Finalizes Contracts for 23 Renewable Projects Totaling 2.3 GW

New York Renewable Energy Contracts secure 23 projects totaling 2.3 GW, spanning offshore wind, solar,…
View more

Global CO2 emissions 'flatlined' in 2019, says IEA

2019 Global CO2 Emissions stayed flat, IEA reports, as renewable energy growth, wind and solar…
View more

New fuel cell could help fix the renewable energy storage problem

Proton Conducting Fuel Cells enable reversible hydrogen energy storage, coupling electrolyzers and fuel cells with…
View more

Sustainable Marine now delivering electricity to Nova Scotia grid from tidal energy

Sustainable Marine tidal energy delivers in-stream power to Nova Scotia's grid from Grand Passage, proving…
View more

Sign Up for Electricity Forum’s Newsletter

Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.

Electricity Today T&D Magazine Subscribe for FREE

Stay informed with the latest T&D policies and technologies.
  • Timely insights from industry experts
  • Practical solutions T&D engineers
  • Free access to every issue

Live Online & In-person Group Training

Advantages To Instructor-Led Training – Instructor-Led Course, Customized Training, Multiple Locations, Economical, CEU Credits, Course Discounts.

Request For Quotation

Whether you would prefer Live Online or In-Person instruction, our electrical training courses can be tailored to meet your company's specific requirements and delivered to your employees in one location or at various locations.